Domestic Gas Reservation Bill 2026 and related bills
26 October 2026
Senator Lisa Darmanin
Chair - Senate Economics Legislation Committee
Dear Senator Darmanin
Re: Domestic Gas Reservation Bill 2026 and related bills
The South Australian Chamber of Mines and Energy (SACOME) represents South Australia’s resources and energy sector, including gas producers, pipeline operators, energy infrastructure providers and major industrial gas users.
SACOME supports reliable and affordable domestic gas supply. However, the bills before the Committee do not create additional gas, reduce the cost of producing it or ensure that it can be delivered where and when it is needed. It seeks to lower prices by compelling additional volumes into the domestic market, including through a default target above forecast demand and a requirement to complete sales even where no reasonable buyer is available.
The Government’s Impact Analysis does not assess whether the scheme’s economy-wide benefits exceed its costs. The $134 million estimate is the regulatory burden over ten years, not the scheme’s net economic cost or benefit.1
The Government’s own evidence acknowledges the central economic risk: downward pressure on prices may make some production uneconomic and reduce production and investment. The Gas Market Review finds that reservation alone does not guarantee access to gas or reasonable prices, and declining legacy production will be increasingly replaced by new supply that is more expensive to produce and transport2. Further investment in production, pipelines and storage is necessary.
South Australia is particularly exposed. Compulsory volumes may reduce demand for gas supplied by domestic-oriented South Australian producers and therefore affect investment incentives for replacement supply. Yet gas supplied elsewhere may count towards compliance without reaching South Australian users or resolving the State’s pipeline, storage, seasonal and peak-demand constraints. The scheme may lower prices in the short term, but weakens the production and infrastructure needed for South Australia’s longer-term energy security.
SACOME recommends that the committee support passage only subject to amendments that confine intervention to demonstrated demand, recognise reasonable commercial offers, account for where and when gas can be delivered, recognise State-secured supply and protect investment in additional production and infrastructure. The proposed amendments below address these issues.
The Government has not quantified the scheme’s net economic benefit
The Government’s Impact Analysis does not assess whether the economic benefits of the scheme exceed its costs. It does not quantify:
The $134 million identified in the Impact Analysis is the estimated regulatory burden over ten years. It measures the administrative cost of the scheme, not its net economic cost or benefit. Any reduction in investment or production affects not only gas producers, but also State revenues that fund public services and regional economic activity. The Impact Analysis does not quantify these impacts.
The analysis describes the scheme’s principal effect as a transfer of value from gas producers to domestic gas users through lower prices. Lower prices benefit gas users, but a transfer between market participants is not, by itself, a net economic benefit. The Government has not assessed whether the benefit to users outweighs displaced production and investment, forgone exports and royalties, additional infrastructure costs and the effect on future supply.
This omission is material because the bills can require compulsory supply beyond demonstrated demand. Under clause 24, the starting point for target aggregate supply is forecast demand plus a default 10%, less forecast supply from non-licence holders. Clause 25 uses that target to determine the quantities allocated to licence holders.
The Minister may reduce the margin, but the bills do not require the additional quantity to correspond to an identified contingency or require its expected benefit to exceed its economic cost.
The physical-sale requirement creates a related problem. Under clauses 16 to 20, at least 90% of the obligation must be met through recognised domestic supply; genuinely offering gas on reasonable commercial terms is not enough. If no reasonable buyer accepts that offer, compelling a completed sale does not address a supply shortfall. It may require the supplier to accept a lower price or other less favourable terms, and may also displace gas another producer would otherwise have sold. It reallocates sales rather than increasing supply to meet unmet demand.
Clause 20 allows up to 10% of the obligation to be dealt with through flexibility arrangements that will be prescribed later in the Gas Market Code. It is not yet clear whether an unsuccessful reasonable offer will qualify. Where a quantity is deferred, clause 21 requires it to be supplied over the following three regulated periods. Deferral therefore carries the mismatch forward: the quantity must be offset in a later period even though no shortage was demonstrated when it arose.
SACOME recommends that:
Market-wide supply is not the same as South Australian energy security
South Australia forms part of the broader interconnected eastern and Northern Territory gas market but has distinct supply, demand and delivery characteristics.
Gas reaches South Australian users from the Cooper Basin, Victoria and Queensland through a limited number of transmission pipelines. Approximately 60% of the gas used in South Australia supports electricity generation. Energy security therefore depends not only on annual gas availability, but also on where the gas is located, firm pipeline capacity, storage and the ability to meet seasonal and peak-day demand.
The Government’s Gas Market Review identifies declining southern production, increasing production and transport costs and pipeline constraints as drivers of higher prices.3 It also finds that reservation alone cannot guarantee access to reasonably priced gas or overcome the increasing cost of replacement production and longer-distance transport. The ACCC similarly finds that southern markets face particular winter risks and will require further investment in production and storage4.
The bills do not ensure that reserved gas addresses those risks. Under clauses 12 and 18, gas supplied anywhere within the interconnected domestic gas market may count towards an exporter’s obligation. It does not have to reach South Australia, even though South Australian demand forms part of the market forecast used to calculate the obligation.
Clauses 26 and 27 do not resolve this problem. They provide transitional relief where an infrastructure constraint existed immediately before commencement and makes supply uneconomic. They do not ensure that reserved gas can reach South Australian users, account for constraints that emerge or change after commencement, or address the availability and cost of firm transport and storage.
Gas supplied in Queensland may satisfy the scheme without improving South Australian energy security if it cannot be transported south when required and at a reasonable cost.
Requiring an exporter to overcome a constraint does not necessarily produce an efficient infrastructure investment. Pipelines and storage require long-term demand and contracts capable of supporting their cost. Without those conditions, the scheme may impose additional transport or infrastructure costs on a licence holder without resolving the underlying constraint.
The treatment of State gas-security measures creates a further risk. The definition of an existing domestic gas reservation arrangement is limited to arrangements in force by 22 December 2025. There is no clear policy reason to exclude a later State arrangement that secures domestic supply and advances the same energy-security objective as the Commonwealth scheme.
The bills should provide an ongoing mechanism to recognise eligible State arrangements as they commence. Recognition should be based on the quantity of domestic supply secured and incorporated into the Commonwealth calibration or adjustment process for the relevant period. The same gas should be recognised only once. Without such a mechanism, later Commonwealth and State measures may impose overlapping requirements and costs without securing any additional gas.
SACOME recommends that:
Short-term price suppression must not weaken long-term supply
Long-term gas security depends on continued investment in production, processing, pipelines and storage. Reservation can reallocate existing gas, but it cannot substitute for the investment needed to develop replacement supply and deliver it to customers.
The Government’s own analysis exposes the economic trade-off. The Impact Analysis accepts that downward pressure on prices may make higher-cost production uneconomic and reduce production and investment5. The ACCC finds that further investment is required to meet long-term demand, while the Gas Market Review finds that replacement supply is likely to cost more than legacy production.
Lower prices benefit domestic users, but expected prices and contract terms must still support the investment required to replace declining production . The Government has not demonstrated that the short-term price reduction will not discourage that investment, resulting in less production and tighter supply over time.
This risk is particularly relevant to South Australia because local producers compete in the domestic market into which compulsory volumes will be supplied. Although clause 24 subtracts forecast supply from non-licence holders when calculating the target, the default demand margin and physical-sale requirement may still require more gas to be sold than the central demand forecast indicates is needed. Those volumes may displace South Australian sales and weaken the returns needed to support replacement supply, without improving the State’s pipeline capacity, storage or peak-day security.
The treatment of additional gas will be critical to whether the scheme encourages or discourages investment in new supply. Under clause 22, where an exporter acquires gas that is not classified as additional and exports it as LNG, its domestic supply obligation increases by the same quantity. If production brought forward by new investment is not recognised as additional gas, acquiring that gas becomes less commercially attractive.
The Consequential Amendments Bill allows zero production baselines and AER approval of additional gas, but the circumstances and assessment criteria remain to be settled through the Gas Market Code and subsequent instruments. Investors need an early and binding decision before committing capital. New projects and material investment that increases or brings forward production from existing fields should qualify, and that status should remain with the gas when it is sold or transferred.
SACOME recommends that:
Existing contracts and the cost of compliance
The economic cost of the scheme will also depend on how it treats existing contracts and the requirements imposed through regulations and other instruments.
Clause 27 recognises a pre-announcement LNG contract only where the Minister is satisfied that non-recognition would likely cause a breach and that the licence holder cannot reasonably produce, acquire or arrange alternative supply.
This may require a licence holder to investigate costly changes to its production, procurement or transport arrangements before an adjustment is available. It also leaves the licence holder uncertain about its obligation if the decision is not made before those arrangements must be settled.
Qualifying LNG contracts entered into on or before 22 December 2025 should be recognised under clear and objective criteria, without requiring the licence holder to demonstrate that non-recognition would likely cause a breach. Decisions should be made early enough to inform production, procurement, transport and contracting arrangements.
The full cost of administering and complying with the scheme cannot yet be assessed. Clause 6 of the Levy Bill leaves the amount and calculation of the levy to regulations that have not been made, while important details of the reporting, audit and financial-assurance requirements will be settled through later rules.
The $134 million regulatory-burden estimate does not establish the amount of the levy or how that cost will be distributed among licence holders. Parliament is therefore being asked to approve the framework before significant elements of its cost and operation are known.
Material rules, methodologies, guidance and cost-recovery arrangements should be settled transparently and well before obligations commence. Reporting should not duplicate information already provided under the Gas Market Code or other Commonwealth and State frameworks.
SACOME recommends that:
Conclusion and summary of recommendations
The committee should recommend targeted amendments before passage. Obligations should reflect demonstrated domestic requirements; reasonable commercial offers and eligible State-secured supply should be recognised; delivery constraints should be properly accounted for; and investment in additional production and infrastructure should be protected. Without these changes, the scheme may lower prices in the short term without ensuring that gas can reach South Australian users or that the investment required for future supply will proceed.
SACOME recommends that the bills be amended to:
[1] DCCEEW/DISR, Dashboard Impact Analysis - Gas Market Review - Domestic Gas Reservation Scheme, October 2026.
[2] Australian Government, Gas Market Review Report, December 2025.
[3] Australian Government, Gas Market Review Report, December 2025.
[4] ACCC, Gas Inquiry June 2026 Interim Report, July 2026.
[5] DCCEEW/DISR, Dashboard Impact Analysis - Gas Market Review - Domestic Gas Reservation Scheme, October 2026.
Senator Lisa Darmanin
Chair - Senate Economics Legislation Committee
Dear Senator Darmanin
Re: Domestic Gas Reservation Bill 2026 and related bills
The South Australian Chamber of Mines and Energy (SACOME) represents South Australia’s resources and energy sector, including gas producers, pipeline operators, energy infrastructure providers and major industrial gas users.
SACOME supports reliable and affordable domestic gas supply. However, the bills before the Committee do not create additional gas, reduce the cost of producing it or ensure that it can be delivered where and when it is needed. It seeks to lower prices by compelling additional volumes into the domestic market, including through a default target above forecast demand and a requirement to complete sales even where no reasonable buyer is available.
The Government’s Impact Analysis does not assess whether the scheme’s economy-wide benefits exceed its costs. The $134 million estimate is the regulatory burden over ten years, not the scheme’s net economic cost or benefit.1
The Government’s own evidence acknowledges the central economic risk: downward pressure on prices may make some production uneconomic and reduce production and investment. The Gas Market Review finds that reservation alone does not guarantee access to gas or reasonable prices, and declining legacy production will be increasingly replaced by new supply that is more expensive to produce and transport2. Further investment in production, pipelines and storage is necessary.
South Australia is particularly exposed. Compulsory volumes may reduce demand for gas supplied by domestic-oriented South Australian producers and therefore affect investment incentives for replacement supply. Yet gas supplied elsewhere may count towards compliance without reaching South Australian users or resolving the State’s pipeline, storage, seasonal and peak-demand constraints. The scheme may lower prices in the short term, but weakens the production and infrastructure needed for South Australia’s longer-term energy security.
SACOME recommends that the committee support passage only subject to amendments that confine intervention to demonstrated demand, recognise reasonable commercial offers, account for where and when gas can be delivered, recognise State-secured supply and protect investment in additional production and infrastructure. The proposed amendments below address these issues.
The Government has not quantified the scheme’s net economic benefit
The Government’s Impact Analysis does not assess whether the economic benefits of the scheme exceed its costs. It does not quantify:
- the value of production or investment that may be displaced;
- additional transport, pipeline and storage costs;
- the effect on domestic-oriented producers;
- forgone export income or State royalties;
- regional effects, including those on South Australia; or
- the longer-term price consequences if reduced investment results in tighter future supply.
The $134 million identified in the Impact Analysis is the estimated regulatory burden over ten years. It measures the administrative cost of the scheme, not its net economic cost or benefit. Any reduction in investment or production affects not only gas producers, but also State revenues that fund public services and regional economic activity. The Impact Analysis does not quantify these impacts.
The analysis describes the scheme’s principal effect as a transfer of value from gas producers to domestic gas users through lower prices. Lower prices benefit gas users, but a transfer between market participants is not, by itself, a net economic benefit. The Government has not assessed whether the benefit to users outweighs displaced production and investment, forgone exports and royalties, additional infrastructure costs and the effect on future supply.
This omission is material because the bills can require compulsory supply beyond demonstrated demand. Under clause 24, the starting point for target aggregate supply is forecast demand plus a default 10%, less forecast supply from non-licence holders. Clause 25 uses that target to determine the quantities allocated to licence holders.
The Minister may reduce the margin, but the bills do not require the additional quantity to correspond to an identified contingency or require its expected benefit to exceed its economic cost.
The physical-sale requirement creates a related problem. Under clauses 16 to 20, at least 90% of the obligation must be met through recognised domestic supply; genuinely offering gas on reasonable commercial terms is not enough. If no reasonable buyer accepts that offer, compelling a completed sale does not address a supply shortfall. It may require the supplier to accept a lower price or other less favourable terms, and may also displace gas another producer would otherwise have sold. It reallocates sales rather than increasing supply to meet unmet demand.
Clause 20 allows up to 10% of the obligation to be dealt with through flexibility arrangements that will be prescribed later in the Gas Market Code. It is not yet clear whether an unsuccessful reasonable offer will qualify. Where a quantity is deferred, clause 21 requires it to be supplied over the following three regulated periods. Deferral therefore carries the mismatch forward: the quantity must be offset in a later period even though no shortage was demonstrated when it arose.
SACOME recommends that:
- Clauses 24 and 25 be amended to set the default demand margin at zero. A higher margin should apply only where published evidence demonstrates that additional supply is needed to address an identified domestic supply risk. Aggregate obligations should not exceed forecast domestic demand, including any justified margin, less forecast supply from non-licence holders.
- Clauses 18 to 21 be amended so gas genuinely offered to the domestic market on reasonable commercial terms satisfies the domestic supply obligation where no buyer accepts the offer. Binding criteria for assessing reasonable offers should be established before obligations commence. If the Government does not adopt the reasonable-offer model and retains a minimum physical-supply requirement, that minimum should be reduced from 90% to 75%.
Market-wide supply is not the same as South Australian energy security
South Australia forms part of the broader interconnected eastern and Northern Territory gas market but has distinct supply, demand and delivery characteristics.
Gas reaches South Australian users from the Cooper Basin, Victoria and Queensland through a limited number of transmission pipelines. Approximately 60% of the gas used in South Australia supports electricity generation. Energy security therefore depends not only on annual gas availability, but also on where the gas is located, firm pipeline capacity, storage and the ability to meet seasonal and peak-day demand.
The Government’s Gas Market Review identifies declining southern production, increasing production and transport costs and pipeline constraints as drivers of higher prices.3 It also finds that reservation alone cannot guarantee access to reasonably priced gas or overcome the increasing cost of replacement production and longer-distance transport. The ACCC similarly finds that southern markets face particular winter risks and will require further investment in production and storage4.
The bills do not ensure that reserved gas addresses those risks. Under clauses 12 and 18, gas supplied anywhere within the interconnected domestic gas market may count towards an exporter’s obligation. It does not have to reach South Australia, even though South Australian demand forms part of the market forecast used to calculate the obligation.
Clauses 26 and 27 do not resolve this problem. They provide transitional relief where an infrastructure constraint existed immediately before commencement and makes supply uneconomic. They do not ensure that reserved gas can reach South Australian users, account for constraints that emerge or change after commencement, or address the availability and cost of firm transport and storage.
Gas supplied in Queensland may satisfy the scheme without improving South Australian energy security if it cannot be transported south when required and at a reasonable cost.
Requiring an exporter to overcome a constraint does not necessarily produce an efficient infrastructure investment. Pipelines and storage require long-term demand and contracts capable of supporting their cost. Without those conditions, the scheme may impose additional transport or infrastructure costs on a licence holder without resolving the underlying constraint.
The treatment of State gas-security measures creates a further risk. The definition of an existing domestic gas reservation arrangement is limited to arrangements in force by 22 December 2025. There is no clear policy reason to exclude a later State arrangement that secures domestic supply and advances the same energy-security objective as the Commonwealth scheme.
The bills should provide an ongoing mechanism to recognise eligible State arrangements as they commence. Recognition should be based on the quantity of domestic supply secured and incorporated into the Commonwealth calibration or adjustment process for the relevant period. The same gas should be recognised only once. Without such a mechanism, later Commonwealth and State measures may impose overlapping requirements and costs without securing any additional gas.
SACOME recommends that:
- Clauses 26 and 27 be amended to recognise physical and commercial constraints affecting delivery, including location, the availability and cost of firm transport and storage, and peak or seasonal delivery capability. Adjustments should be available for constraints that arise or change after commencement, not only those existing immediately before commencement.
- The bills be amended to remove the fixed eligibility date for State gas-security arrangements and establish an ongoing mechanism for recognising eligible arrangements, including the South Australian Strategic Gas Reserve, as they commence. Supply secured through those arrangements should be taken into account when calculating or adjusting Commonwealth obligations for the relevant period, with clear timing rules and safeguards against double counting.
Short-term price suppression must not weaken long-term supply
Long-term gas security depends on continued investment in production, processing, pipelines and storage. Reservation can reallocate existing gas, but it cannot substitute for the investment needed to develop replacement supply and deliver it to customers.
The Government’s own analysis exposes the economic trade-off. The Impact Analysis accepts that downward pressure on prices may make higher-cost production uneconomic and reduce production and investment5. The ACCC finds that further investment is required to meet long-term demand, while the Gas Market Review finds that replacement supply is likely to cost more than legacy production.
Lower prices benefit domestic users, but expected prices and contract terms must still support the investment required to replace declining production . The Government has not demonstrated that the short-term price reduction will not discourage that investment, resulting in less production and tighter supply over time.
This risk is particularly relevant to South Australia because local producers compete in the domestic market into which compulsory volumes will be supplied. Although clause 24 subtracts forecast supply from non-licence holders when calculating the target, the default demand margin and physical-sale requirement may still require more gas to be sold than the central demand forecast indicates is needed. Those volumes may displace South Australian sales and weaken the returns needed to support replacement supply, without improving the State’s pipeline capacity, storage or peak-day security.
The treatment of additional gas will be critical to whether the scheme encourages or discourages investment in new supply. Under clause 22, where an exporter acquires gas that is not classified as additional and exports it as LNG, its domestic supply obligation increases by the same quantity. If production brought forward by new investment is not recognised as additional gas, acquiring that gas becomes less commercially attractive.
The Consequential Amendments Bill allows zero production baselines and AER approval of additional gas, but the circumstances and assessment criteria remain to be settled through the Gas Market Code and subsequent instruments. Investors need an early and binding decision before committing capital. New projects and material investment that increases or brings forward production from existing fields should qualify, and that status should remain with the gas when it is sold or transferred.
SACOME recommends that:
- The additional-gas framework in the Consequential Amendments Bill and the Gas Market Code provide zero production baselines for projects with no production history, decline-adjusted baselines for existing fields, and recognition of material investment that increases or brings forward production from existing fields.
- Additional-gas determinations be available early enough to be relied on before final investment and contracting decisions, remain binding for an appropriate period, and preserve additional-gas status when the gas is sold or transferred.
- The production-baseline methodology, additional-gas criteria and related guidance be settled and published with sufficient lead time before 1 January 2028 to support investment and contracting decisions.
Existing contracts and the cost of compliance
The economic cost of the scheme will also depend on how it treats existing contracts and the requirements imposed through regulations and other instruments.
Clause 27 recognises a pre-announcement LNG contract only where the Minister is satisfied that non-recognition would likely cause a breach and that the licence holder cannot reasonably produce, acquire or arrange alternative supply.
This may require a licence holder to investigate costly changes to its production, procurement or transport arrangements before an adjustment is available. It also leaves the licence holder uncertain about its obligation if the decision is not made before those arrangements must be settled.
Qualifying LNG contracts entered into on or before 22 December 2025 should be recognised under clear and objective criteria, without requiring the licence holder to demonstrate that non-recognition would likely cause a breach. Decisions should be made early enough to inform production, procurement, transport and contracting arrangements.
The full cost of administering and complying with the scheme cannot yet be assessed. Clause 6 of the Levy Bill leaves the amount and calculation of the levy to regulations that have not been made, while important details of the reporting, audit and financial-assurance requirements will be settled through later rules.
The $134 million regulatory-burden estimate does not establish the amount of the levy or how that cost will be distributed among licence holders. Parliament is therefore being asked to approve the framework before significant elements of its cost and operation are known.
Material rules, methodologies, guidance and cost-recovery arrangements should be settled transparently and well before obligations commence. Reporting should not duplicate information already provided under the Gas Market Code or other Commonwealth and State frameworks.
SACOME recommends that:
- Clauses 26 and 27 be amended so pre-announcement LNG contracts can be recognised without requiring a licence holder to establish that non-recognition would likely cause a breach. Adjustment decisions should be made before the relevant obligation applies.
- Material implementation instruments be settled and published with sufficient lead time before obligations commence. The bills and implementation instruments should provide clear decision criteria, reasons for decisions, appropriate review rights and reporting requirements that do not duplicate existing Commonwealth or State requirements.
- Charges imposed under the Levy Bill be limited to the efficient cost of administering the scheme, with the calculation methodology and proposed charges published for consultation before commencement.
Conclusion and summary of recommendations
The committee should recommend targeted amendments before passage. Obligations should reflect demonstrated domestic requirements; reasonable commercial offers and eligible State-secured supply should be recognised; delivery constraints should be properly accounted for; and investment in additional production and infrastructure should be protected. Without these changes, the scheme may lower prices in the short term without ensuring that gas can reach South Australian users or that the investment required for future supply will proceed.
SACOME recommends that the bills be amended to:
- set the default demand margin at zero, permit a higher margin only where published evidence demonstrates a need, and limit aggregate obligations to that need;
- recognise gas genuinely offered on reasonable commercial terms where no reasonable buyer is available and, if a minimum physical-supply requirement is retained, reduce it from 90% to 75%;
- recognise physical and commercial constraints affecting delivery, including location, firm pipeline capacity, storage and peak or seasonal delivery;
- establish a mechanism to recognise eligible State gas-security arrangements, including the South Australian Strategic Gas Reserve, without counting the same supply twice;
- provide zero baselines for projects with no production history, decline-adjusted baselines for existing fields and recognition of material investment that increases or brings forward production;
- allow early and binding additional-gas decisions and preserve additional-gas status when gas is sold or transferred;
- settle and publish material rules, methodologies and guidance with sufficient lead time before obligations commence;
- recognise qualifying pre-announcement LNG contracts without requiring a likely breach, and decide adjustments before the relevant obligation applies;
- provide clear decision criteria, reasons, appropriate review rights and reporting requirements that do not duplicate existing Commonwealth or State requirements; and
- limit regulatory charges to efficient administration costs and publish the calculation methodology and proposed charges for consultation before commencement.
[1] DCCEEW/DISR, Dashboard Impact Analysis - Gas Market Review - Domestic Gas Reservation Scheme, October 2026.
[2] Australian Government, Gas Market Review Report, December 2025.
[3] Australian Government, Gas Market Review Report, December 2025.
[4] ACCC, Gas Inquiry June 2026 Interim Report, July 2026.
[5] DCCEEW/DISR, Dashboard Impact Analysis - Gas Market Review - Domestic Gas Reservation Scheme, October 2026.