Executive Summary
South Australia is uniquely positioned to benefit from growing global demand for the minerals, metals and energy resources needed to support economic growth, energy security and decarbonisation.
The State is home to globally significant copper, uranium, critical mineral and energy resources, but attracting investment in their exploration and development will depend on the competitiveness of South Australia's regulatory system as well as its resource endowment.
Resource projects are long-term, capital-intensive investments. Investors compare jurisdictions not only on geology and prospectivity, but on regulatory certainty, efficiency and the time required to secure approvals and maintain tenure. Delays, duplication and regulatory complexity increase project costs, defer investment decisions and reduce South Australia's attractiveness relative to competing jurisdictions.
Resource investment is highly mobile. Investors routinely compare South Australian approval pathways against other jurisdictions including Western Australia, Queensland, Canada and South America. Small differences in regulatory certainty can materially influence investment decisions where geology and commodity prospects are otherwise attractive.
The issue is not whether projects are regulated. It is whether regulation delivers better environmental, heritage and safety outcomes or merely consumes time and resources without changing outcomes.
The opportunity cost of inefficient regulation is significant. Delayed approvals, duplicated assessments and unnecessary administrative requirements do not simply create additional compliance costs; they can delay employment opportunities, regional economic activity, infrastructure investment, royalty revenue and the development of strategically important mineral and energy resources. In some cases, investment may be redirected to jurisdictions that can deliver equivalent environmental, heritage and safety outcomes through more efficient regulatory systems.
Regulation should be proportionate to the change being proposed and the risk it creates. If nothing material has changed, companies should not have to repeat assessments, commission new studies or resubmit information the government already holds. A once-assessed, once-approved principle should be adopted. Where something has changed, additional requirements should be limited to what is needed to assess that change and any new or increased risk it creates.
SACOME has identified six practical reforms that would reduce unnecessary regulatory burden while maintaining appropriate oversight. Most of these reforms could be progressed through changes to regulations, policy or administrative practice rather than amendments to primary legislation, providing an opportunity for the government to deliver meaningful reform in the near term.
SACOME recommends that the South Australian government:
Together, these reforms would strengthen South Australia's competitiveness as a destination for resources investment while maintaining the high environmental, heritage and safety standards expected by the community. Most importantly, they would help ensure regulatory effort is directed toward managing genuine risks rather than administering unnecessary process.
Proposed reforms
1. Strengthen DEM’s role as lead regulator for resource projects
Resources projects can require input from several state government agencies. Although DEM already describes its approach to mining regulation as providing a ‘one-window-to-government’, members continue to face changing, overlapping and sometimes inconsistent requirements as applications move between agencies.
Members report that requirements agreed early in an assessment can be revisited as other agencies become involved. This can result in additional information requests, repeated technical assessments and requirements, including on matters already approved or unrelated to the activity or change being assessed.
In one case, a proponent completed DEM's project scoping process and agreed environmental assessments required, only for DEW to seek substantial additional information when the project reached the PEPR stage. Members have also reported matters moving between DEM, DEW and the EPA without clear responsibility for clarifying requirements and resolving the outstanding issues. These experiences demonstrate that early engagement with DEM does not necessarily provide certainty about assessment requirements, and that proponents can be left navigating differences between regulators.
DEM's role as lead regulator must extend beyond coordinating referrals and passing information requests between agencies. DEM should be responsible for critically assessing whether requirements proposed by other agencies are relevant to the application or change under consideration, and whether they are necessary to assess any new or increased risk. Where an agency seeks to reopen previously approved matters, DEM should require a clear explanation of how those matters are materially affected by the proposed change. Unnecessary or duplicative requirements should be resolved within government rather than passed on to the proponent.
The South Australian Productivity Commission has previously recommended formal administrative arrangements between DEM and referral agencies to clarify regulatory responsibilities, limit information requests to what is necessary for each decision, and establish referral timeframes and escalation procedures. While administrative arrangements exist between DEM and the EPA, SACOME has been unable to identify an equivalent current, publicly available arrangement governing DEM and DEW's respective responsibilities in mining assessments. Member experiences indicate that existing arrangements have not provided sufficient certainty about assessment scope, agency responsibilities or the resolution of conflicting requirements.
SACOME recommends that the South Australian Government strengthen DEM's authority as the lead regulator for resources projects through a formal whole-of-government coordination framework, supported by legislative amendments where necessary, to ensure DEM has the authority to manage assessment scope, coordinate agency requirements and hold participating agencies accountable for referral timeframes. The formal arrangements should be published, with their operation and effectiveness periodically reviewed.
The framework should provide for:
Where separate statutory decisions are required, those responsibilities would remain with the relevant agency or Minister. However, the Government should identify and address any legislative barriers preventing DEM from effectively coordinating the assessment process and holding participating agencies accountable.
2. Use the existing mechanism for low-risk changes
The Mining Act 1971 already allows the Mining Regulations to identify changes to existing operations that do not need to go through the Change in Operations approval process. However, this mechanism is not being used to provide a practical pathway for routine, low-risk changes.
As a result, relatively minor changes can trigger substantial new information requirements and reopen matters that have already been assessed and approved, even where they have no practical bearing on the change being proposed.
One member sought approval to relocate stockpiles and change the location of clearing within an already approved operational area. The changes did not increase production, expand the approved area or alter rehabilitation outcomes. Despite the limited scope of the changes, the broader environmental approval was reopened, including groundwater assessment. Groundwater requirements changed several times as different officers became involved. An amendment expected to take three to four months ultimately took more than 12 months, with substantial additional assessment requirements disproportionate to the limited changes being proposed.
Another member deliberately confined its application to a new area of disturbance, clearly separating the proposed change from the existing operation and matters that had already been assessed and agreed. Despite this, the assessor extended the scope of the assessment beyond the new disturbance, reopening matters that were not changing. Relevant guidelines changed three times during the assessment, requiring the company to repeatedly re-engage consultants and incur additional costs to redo calculations. This included recalculating an environmental offset even though an existing offset agreement meant the revised calculation had no practical effect on the project or its environmental outcomes. The application took approximately 18 months.
Matters relating to the existing operation that have already been assessed and approved should not be reopened unless the proposed change materially affects them. Where it does, any additional studies, modelling or information should be limited to what is needed to assess that impact or any new risk created by the change.
SACOME recommends using the existing power in section 56Q(4) of the Mining Act 1971 to exclude defined low-risk changes from the Change in Operations approval process, supported by a notification requirement under the Mining Regulations 2020.
The prescribed class should be limited to changes that remain within existing authorised operations and can be demonstrated not to materially affect approved environmental outcomes or introduce a new material environmental risk. Changes requiring an alteration to an existing statutory approval or condition would remain subject to the applicable approval process.
There is already a South Australian precedent for this approach. Under the Energy Resources Act 2000, lower-risk petroleum and energy resource activities can proceed by notification rather than prior approval where the operator has demonstrated its capacity to meet existing regulatory requirements. Western Australia also allows defined minimal-disturbance activities to proceed by notification, while Queensland provides streamlined treatment for minor changes where there is no significant increase in environmental harm.
3. Streamline mining lease renewals and minor tenure amendments
Under the Mining Act 1971, a mining lease holder must apply to the Minister for renewal, specifying the term sought and the reasons for it. DEM also requires information about the mine’s future operations, including remaining mine life, planned extraction and rehabilitation, much of which is already available through its ongoing regulation of the operation.
For an existing operation that is complying with its obligations, renewal should not require the company to make a new case for continuing the underlying tenure. The renewal process should establish what has materially changed and the term for which the lease is still required, using information already held by DEM wherever possible. Where the activity and environmental impacts have not changed and existing approvals remain in place, renewal of the tenure should not itself trigger reassessment of matters that have already been considered and approved.
One member reported that a straightforward renewal of existing tenure resulted in previously agreed environmental assessment requirements being reopened, despite no change to the operation or its environmental impacts. The member waited approximately eight months for clarification from DEM and DEW on whether additional modelling would be required. As nothing had materially changed, there was no apparent basis for reopening the previously approved environmental assessments as part of the renewal process.
The same principle should apply where a renewal is accompanied by a minor amendment to the existing tenure. Where the amendment does not materially change the approved activity, its impacts or the rights affected, it should not make the renewal process substantially more onerous or require matters already approved to be reassessed.
The Mining Act already provides mechanisms for certain changes to existing tenure, including alteration of lease conditions, rectification of boundaries and amalgamation of tenement areas. DEM should use these existing powers, where applicable, to allow eligible minor amendments to be considered alongside lease renewal through a single coordinated process.
SACOME recommends streamlining mining lease renewals for compliant operators and establishing a combined process for renewals accompanied by minor tenure amendments. Applications should rely on existing approvals and regulatory information, with additional assessment limited to material changes, new or increased risks, or affected rights. Where existing statutory powers permit, renewal and amendment should be dealt with through a single application.
The Commonwealth Export Control Act 2020 provides a precedent for coordinating renewal and variation applications, expressly allowing licence holders to apply for both through a single application. A similar approach for eligible mining lease renewals and minor amendments would reduce unnecessary duplication.
4. Fast-track straightforward tenement surrenders
Timely surrender of exploration tenure is important to ensure prospective land becomes available for further exploration and development. The 2021 amendments to the Mining Act 1971 introduced an 18-year maximum exploration licence term to encourage active exploration and productive turnover of prospective ground. Prolonged surrender processes undermine this objective, leaving land tied up in tenure rather than available for new exploration, investment and potential future mineral production and royalties.
Members have reported surrender and related tenure transactions taking 12 to 18 months or longer. In some cases, DEM has required proponents to resubmit information already provided through annual reporting, creating unnecessary administrative work. These delays can also prolong tenure and rental liabilities while applications remain under assessment.
In one case, a partial surrender lodged in November 2025 had still not been determined when the member raised the matter with SACOME eight months later. By that time, the company had also applied to surrender the entire tenement, with neither application determined.
Surrender requirements should be proportionate to the extent of land disturbance, rehabilitation status and outstanding obligations. Undisturbed tenure and areas where rehabilitation has been completed should be eligible for fast-track assessment using existing DEM records and documentary evidence, with additional information, verification or site inspections required only where necessary to address identified risks or outstanding obligations.
While existing regulatory provisions and DEM procedures provide some flexibility in assessing surrender applications and managing fees, they have not prevented prolonged delays and continuing liabilities for proponents. A more predictable process is needed, with clear decision timeframes, financial protection against government processing delays and binding consequences where applications are not determined.
SACOME recommends reforming the surrender process for mining and exploration tenements to:
5. Make better use of existing heritage surveys and streamline heritage clearance processes
Aboriginal heritage surveys are an important part of identifying and protecting Aboriginal heritage during exploration. However, members report that heritage clearance processes can be lengthy and costly, including requests for repeated surveys over areas that have already been assessed, even where the proposed activity and relevant circumstances have not materially changed. The basis for determining whether further survey work is necessary is not always clear.
Members have reported land access negotiations taking between 12 months and three years, with heritage clearances taking a further eight to twelve months in some cases. These delays occur before exploration activities can commence. The cost of heritage surveys, particularly where the work is repeated, can also be substantial, materially affecting the viability of exploration, especially for junior and privately funded companies.
Additional heritage surveys will sometimes be necessary where the proposed activity or area of disturbance has changed, previous surveys do not adequately cover the proposed work, or new heritage information requires further assessment. However, the need for additional work should be assessed against these factors rather than be automatically required. Clearer agreement at the outset on survey scope and the heritage risks being assessed would reduce unnecessary work, costs and delays while maintaining appropriate heritage protections.
SACOME recommends that the South Australian Government work with Traditional Owners and industry to establish a proportionate Aboriginal heritage assessment framework for mineral exploration that provides for:
The framework should be developed with Traditional Owners and their representative bodies to ensure that more efficient processes maintain appropriate heritage protections and meaningful engagement.
Western Australia’s Noongar Standard Heritage Agreement provides a practical precedent for proportionate heritage assessment. It differentiates requirements according to the level of ground disturbance, provides for consideration of previous surveys and establishes response timeframes and procedures for resolving disagreements. Certain minimal-impact activities can proceed without an activity notice, while low-ground-disturbance activities are subject to requirements that encourage consideration of alternatives to additional survey work. These arrangements demonstrate how heritage requirements can be tailored to the proposed activity while maintaining appropriate protections.
6. Simplify notification requirements for low-surveillance energy resource activities
South Australia's Energy Resources Act 2000 already applies a risk-based approach to regulated activities. Operators that have demonstrated appropriate management systems, experience and compliance can have activities classified as requiring low-level official surveillance. These activities can proceed by notification rather than requiring prior approval.
However, low-level activities remain subject to detailed notification requirements under Regulations 18 and 20 of the Energy Resources Regulations 2013. Regulation 20 applies many of the same information requirements to both high- and low-surveillance activities, including information about the activity, location, contractors, land access, environmental requirements and, depending on the activity, detailed technical information.
Some of this information is necessarily specific to the proposed activity. Other requirements relate to matters that DEM already regulates or for which the operator has separate statutory obligations. For example, operators must provide landowner details, declare compliance with the land-access requirements of the Act and provide a copy of the notice already required to be given to the landowner.
The notification process should reflect the purpose of low-level surveillance. DEM should receive the information it needs to understand what is proposed, where and when it will occur, and any information that is new or specific to the activity. Operators should not be required to reproduce information DEM already holds or provide supporting material demonstrating compliance with separate obligations where a declaration would provide sufficient assurance.
SACOME recommends amending Regulations 18 and 20 of the Energy Resources Regulations 2013 to limit notification requirements for low-surveillance activities to information specific to the proposed activity, matters that have materially changed and evidence necessary to demonstrate compliance with statutory requirements. Operators should be able to reference current information already held by DEM, including approved management systems and environmental arrangements, rather than resubmit it.
These reforms could be implemented through amendment of the Energy Resources Regulations 2013 without amendment of the Energy Resources Act 2000.
Summary
South Australia possesses world-class mineral and energy resources.
The state's challenge is not attracting interest in those resources, but ensuring that regulatory processes are proportionate, streamlined and increase South Australia’s ability to compete for capital.
The reforms proposed by SACOME do not seek lower standards. They seek a system where regulatory effort is focused on genuine environmental, heritage and safety risks.
If implemented, these reforms would improve productivity, strengthen investment competitiveness and help South Australia realise the full economic potential of its resources sector.
Radical streamlining of South Australia’s resources regulation
Executive Summary
South Australia is uniquely positioned to benefit from growing global demand for the minerals, metals and energy resources needed to support economic growth, energy security and decarbonisation.
The State is home to globally significant copper, uranium, critical mineral and energy resources, but attracting investment in their exploration and development will depend on the competitiveness of South Australia's regulatory system as well as its resource endowment.
Resource projects are long-term, capital-intensive investments. Investors compare jurisdictions not only on geology and prospectivity, but on regulatory certainty, efficiency and the time required to secure approvals and maintain tenure. Delays, duplication and regulatory complexity increase project costs, defer investment decisions and reduce South Australia's attractiveness relative to competing jurisdictions.
Resource investment is highly mobile. Investors routinely compare South Australian approval pathways against other jurisdictions including Western Australia, Queensland, Canada and South America. Small differences in regulatory certainty can materially influence investment decisions where geology and commodity prospects are otherwise attractive.
The issue is not whether projects are regulated. It is whether regulation delivers better environmental, heritage and safety outcomes or merely consumes time and resources without changing outcomes.
The opportunity cost of inefficient regulation is significant. Delayed approvals, duplicated assessments and unnecessary administrative requirements do not simply create additional compliance costs; they can delay employment opportunities, regional economic activity, infrastructure investment, royalty revenue and the development of strategically important mineral and energy resources. In some cases, investment may be redirected to jurisdictions that can deliver equivalent environmental, heritage and safety outcomes through more efficient regulatory systems.
Regulation should be proportionate to the change being proposed and the risk it creates. If nothing material has changed, companies should not have to repeat assessments, commission new studies or resubmit information the government already holds. A once-assessed, once-approved principle should be adopted. Where something has changed, additional requirements should be limited to what is needed to assess that change and any new or increased risk it creates.
SACOME has identified six practical reforms that would reduce unnecessary regulatory burden while maintaining appropriate oversight. Most of these reforms could be progressed through changes to regulations, policy or administrative practice rather than amendments to primary legislation, providing an opportunity for the government to deliver meaningful reform in the near term.
SACOME recommends that the South Australian government:
- Reduce duplication and conflicting requirements across government agencies: formalise DEM's lead regulator role to coordinate assessment requirements, ensure requests from DEW and EPA are relevant and proportionate to the proposed change, and provide proponents with consolidated information requests and clear timeframes.
- Remove unnecessary approvals for low-risk changes to mining operations: use the existing power in section 56Q(4) of the Mining Act 1971 to allow defined changes to proceed by notification where they do not materially alter approved environmental outcomes or introduce new material risks.
- Streamline mining lease renewals and minor tenure amendments: establish a single process for renewals accompanied by minor amendments that relies on existing information and approvals, avoids reassessment of unchanged matters, and provides a simplified amendment pathway.
- Fast-track tenement surrenders: establish proportionate assessment requirements and defined decision timeframes, protect proponents from continuing rental and fee liabilities during government processing delays, and provide deemed acceptance for eligible applications where statutory timeframes are exceeded.
- Avoid unnecessary repeat Aboriginal heritage surveys: establish a proportionate assessment framework with Traditional Owners and industry that supports reuse of existing surveys, clearer scoping of work, streamlined requirements for low-impact exploration and timely decisions on whether further surveys are needed.
- Remove duplicated information requirements for low-surveillance energy resource activities: amend Regulations 18 and 20 so operators can reference existing approved information and provide only activity-specific, changed or otherwise necessary supporting information.
Together, these reforms would strengthen South Australia's competitiveness as a destination for resources investment while maintaining the high environmental, heritage and safety standards expected by the community. Most importantly, they would help ensure regulatory effort is directed toward managing genuine risks rather than administering unnecessary process.
Proposed reforms
1. Strengthen DEM’s role as lead regulator for resource projects
Resources projects can require input from several state government agencies. Although DEM already describes its approach to mining regulation as providing a ‘one-window-to-government’, members continue to face changing, overlapping and sometimes inconsistent requirements as applications move between agencies.
Members report that requirements agreed early in an assessment can be revisited as other agencies become involved. This can result in additional information requests, repeated technical assessments and requirements, including on matters already approved or unrelated to the activity or change being assessed.
In one case, a proponent completed DEM's project scoping process and agreed environmental assessments required, only for DEW to seek substantial additional information when the project reached the PEPR stage. Members have also reported matters moving between DEM, DEW and the EPA without clear responsibility for clarifying requirements and resolving the outstanding issues. These experiences demonstrate that early engagement with DEM does not necessarily provide certainty about assessment requirements, and that proponents can be left navigating differences between regulators.
DEM's role as lead regulator must extend beyond coordinating referrals and passing information requests between agencies. DEM should be responsible for critically assessing whether requirements proposed by other agencies are relevant to the application or change under consideration, and whether they are necessary to assess any new or increased risk. Where an agency seeks to reopen previously approved matters, DEM should require a clear explanation of how those matters are materially affected by the proposed change. Unnecessary or duplicative requirements should be resolved within government rather than passed on to the proponent.
The South Australian Productivity Commission has previously recommended formal administrative arrangements between DEM and referral agencies to clarify regulatory responsibilities, limit information requests to what is necessary for each decision, and establish referral timeframes and escalation procedures. While administrative arrangements exist between DEM and the EPA, SACOME has been unable to identify an equivalent current, publicly available arrangement governing DEM and DEW's respective responsibilities in mining assessments. Member experiences indicate that existing arrangements have not provided sufficient certainty about assessment scope, agency responsibilities or the resolution of conflicting requirements.
SACOME recommends that the South Australian Government strengthen DEM's authority as the lead regulator for resources projects through a formal whole-of-government coordination framework, supported by legislative amendments where necessary, to ensure DEM has the authority to manage assessment scope, coordinate agency requirements and hold participating agencies accountable for referral timeframes. The formal arrangements should be published, with their operation and effectiveness periodically reviewed.
The framework should provide for:
- Clear accountability: DEM to coordinate assessment scope and agency requirements, including challenging requests that revisit previously approved matters without a demonstrated need.
- Formal interagency arrangements: agreed responsibilities, referral triggers and processes for consolidating information requests and resolving conflicting requirements within government rather than passing them to proponents.
- Enforceable referral timeframes: defined agency response periods, with mandatory escalation and resolution of outstanding matters when deadlines are not met.
Where separate statutory decisions are required, those responsibilities would remain with the relevant agency or Minister. However, the Government should identify and address any legislative barriers preventing DEM from effectively coordinating the assessment process and holding participating agencies accountable.
2. Use the existing mechanism for low-risk changes
The Mining Act 1971 already allows the Mining Regulations to identify changes to existing operations that do not need to go through the Change in Operations approval process. However, this mechanism is not being used to provide a practical pathway for routine, low-risk changes.
As a result, relatively minor changes can trigger substantial new information requirements and reopen matters that have already been assessed and approved, even where they have no practical bearing on the change being proposed.
One member sought approval to relocate stockpiles and change the location of clearing within an already approved operational area. The changes did not increase production, expand the approved area or alter rehabilitation outcomes. Despite the limited scope of the changes, the broader environmental approval was reopened, including groundwater assessment. Groundwater requirements changed several times as different officers became involved. An amendment expected to take three to four months ultimately took more than 12 months, with substantial additional assessment requirements disproportionate to the limited changes being proposed.
Another member deliberately confined its application to a new area of disturbance, clearly separating the proposed change from the existing operation and matters that had already been assessed and agreed. Despite this, the assessor extended the scope of the assessment beyond the new disturbance, reopening matters that were not changing. Relevant guidelines changed three times during the assessment, requiring the company to repeatedly re-engage consultants and incur additional costs to redo calculations. This included recalculating an environmental offset even though an existing offset agreement meant the revised calculation had no practical effect on the project or its environmental outcomes. The application took approximately 18 months.
Matters relating to the existing operation that have already been assessed and approved should not be reopened unless the proposed change materially affects them. Where it does, any additional studies, modelling or information should be limited to what is needed to assess that impact or any new risk created by the change.
SACOME recommends using the existing power in section 56Q(4) of the Mining Act 1971 to exclude defined low-risk changes from the Change in Operations approval process, supported by a notification requirement under the Mining Regulations 2020.
The prescribed class should be limited to changes that remain within existing authorised operations and can be demonstrated not to materially affect approved environmental outcomes or introduce a new material environmental risk. Changes requiring an alteration to an existing statutory approval or condition would remain subject to the applicable approval process.
There is already a South Australian precedent for this approach. Under the Energy Resources Act 2000, lower-risk petroleum and energy resource activities can proceed by notification rather than prior approval where the operator has demonstrated its capacity to meet existing regulatory requirements. Western Australia also allows defined minimal-disturbance activities to proceed by notification, while Queensland provides streamlined treatment for minor changes where there is no significant increase in environmental harm.
3. Streamline mining lease renewals and minor tenure amendments
Under the Mining Act 1971, a mining lease holder must apply to the Minister for renewal, specifying the term sought and the reasons for it. DEM also requires information about the mine’s future operations, including remaining mine life, planned extraction and rehabilitation, much of which is already available through its ongoing regulation of the operation.
For an existing operation that is complying with its obligations, renewal should not require the company to make a new case for continuing the underlying tenure. The renewal process should establish what has materially changed and the term for which the lease is still required, using information already held by DEM wherever possible. Where the activity and environmental impacts have not changed and existing approvals remain in place, renewal of the tenure should not itself trigger reassessment of matters that have already been considered and approved.
One member reported that a straightforward renewal of existing tenure resulted in previously agreed environmental assessment requirements being reopened, despite no change to the operation or its environmental impacts. The member waited approximately eight months for clarification from DEM and DEW on whether additional modelling would be required. As nothing had materially changed, there was no apparent basis for reopening the previously approved environmental assessments as part of the renewal process.
The same principle should apply where a renewal is accompanied by a minor amendment to the existing tenure. Where the amendment does not materially change the approved activity, its impacts or the rights affected, it should not make the renewal process substantially more onerous or require matters already approved to be reassessed.
The Mining Act already provides mechanisms for certain changes to existing tenure, including alteration of lease conditions, rectification of boundaries and amalgamation of tenement areas. DEM should use these existing powers, where applicable, to allow eligible minor amendments to be considered alongside lease renewal through a single coordinated process.
SACOME recommends streamlining mining lease renewals for compliant operators and establishing a combined process for renewals accompanied by minor tenure amendments. Applications should rely on existing approvals and regulatory information, with additional assessment limited to material changes, new or increased risks, or affected rights. Where existing statutory powers permit, renewal and amendment should be dealt with through a single application.
The Commonwealth Export Control Act 2020 provides a precedent for coordinating renewal and variation applications, expressly allowing licence holders to apply for both through a single application. A similar approach for eligible mining lease renewals and minor amendments would reduce unnecessary duplication.
4. Fast-track straightforward tenement surrenders
Timely surrender of exploration tenure is important to ensure prospective land becomes available for further exploration and development. The 2021 amendments to the Mining Act 1971 introduced an 18-year maximum exploration licence term to encourage active exploration and productive turnover of prospective ground. Prolonged surrender processes undermine this objective, leaving land tied up in tenure rather than available for new exploration, investment and potential future mineral production and royalties.
Members have reported surrender and related tenure transactions taking 12 to 18 months or longer. In some cases, DEM has required proponents to resubmit information already provided through annual reporting, creating unnecessary administrative work. These delays can also prolong tenure and rental liabilities while applications remain under assessment.
In one case, a partial surrender lodged in November 2025 had still not been determined when the member raised the matter with SACOME eight months later. By that time, the company had also applied to surrender the entire tenement, with neither application determined.
Surrender requirements should be proportionate to the extent of land disturbance, rehabilitation status and outstanding obligations. Undisturbed tenure and areas where rehabilitation has been completed should be eligible for fast-track assessment using existing DEM records and documentary evidence, with additional information, verification or site inspections required only where necessary to address identified risks or outstanding obligations.
While existing regulatory provisions and DEM procedures provide some flexibility in assessing surrender applications and managing fees, they have not prevented prolonged delays and continuing liabilities for proponents. A more predictable process is needed, with clear decision timeframes, financial protection against government processing delays and binding consequences where applications are not determined.
SACOME recommends reforming the surrender process for mining and exploration tenements to:
- Establish a fast-track, risk-based surrender process through amendments to Regulation 52 of the Mining Regulations 2020 and associated DEM procedures. Eligible full and partial surrender applications should be determined by authorised DEM officers under section 12 of the Mining Act 1971, within 30 days for straightforward surrenders of undisturbed land and proportionate timeframes for other applications.
- Remove the financial consequences of government processing delays by ensuring rental and fees for land being relinquished cease accruing from the date a complete, eligible surrender application is lodged. This should apply to full and partial surrenders, irrespective of annual fee anniversary dates, with appropriate refunds or credits for charges paid in advance.
- Introduce deemed acceptance for eligible surrender applications. As a secondary reform, amend section 56X of the Mining Act 1971 so that applications are deemed accepted where DEM has not identified and notified the holder of material outstanding obligations within the prescribed decision timeframe.
5. Make better use of existing heritage surveys and streamline heritage clearance processes
Aboriginal heritage surveys are an important part of identifying and protecting Aboriginal heritage during exploration. However, members report that heritage clearance processes can be lengthy and costly, including requests for repeated surveys over areas that have already been assessed, even where the proposed activity and relevant circumstances have not materially changed. The basis for determining whether further survey work is necessary is not always clear.
Members have reported land access negotiations taking between 12 months and three years, with heritage clearances taking a further eight to twelve months in some cases. These delays occur before exploration activities can commence. The cost of heritage surveys, particularly where the work is repeated, can also be substantial, materially affecting the viability of exploration, especially for junior and privately funded companies.
Additional heritage surveys will sometimes be necessary where the proposed activity or area of disturbance has changed, previous surveys do not adequately cover the proposed work, or new heritage information requires further assessment. However, the need for additional work should be assessed against these factors rather than be automatically required. Clearer agreement at the outset on survey scope and the heritage risks being assessed would reduce unnecessary work, costs and delays while maintaining appropriate heritage protections.
SACOME recommends that the South Australian Government work with Traditional Owners and industry to establish a proportionate Aboriginal heritage assessment framework for mineral exploration that provides for:
- Clearer survey scoping: requirements proportionate to the proposed activity, its potential heritage impacts and the extent of disturbance, with survey scope agreed before work is commissioned.
- Greater use of existing heritage surveys: clear criteria for assessing their suitability and identifying when additional work is necessary, supported by improved identification and use of previous survey information through existing South Australian heritage information systems, subject to Traditional Owner consent and appropriate protections for culturally sensitive information.
- Streamlined requirements for low-impact exploration: agreed categories of minimal-impact activities that may proceed without additional surveys where appropriate, taking account of existing survey information and any new heritage risks.
- Defined notification and response procedures: agreed timeframes for determining whether further surveys are required, with a process for resolving disagreements about survey requirements or scope before additional work is commissioned.
The framework should be developed with Traditional Owners and their representative bodies to ensure that more efficient processes maintain appropriate heritage protections and meaningful engagement.
Western Australia’s Noongar Standard Heritage Agreement provides a practical precedent for proportionate heritage assessment. It differentiates requirements according to the level of ground disturbance, provides for consideration of previous surveys and establishes response timeframes and procedures for resolving disagreements. Certain minimal-impact activities can proceed without an activity notice, while low-ground-disturbance activities are subject to requirements that encourage consideration of alternatives to additional survey work. These arrangements demonstrate how heritage requirements can be tailored to the proposed activity while maintaining appropriate protections.
6. Simplify notification requirements for low-surveillance energy resource activities
South Australia's Energy Resources Act 2000 already applies a risk-based approach to regulated activities. Operators that have demonstrated appropriate management systems, experience and compliance can have activities classified as requiring low-level official surveillance. These activities can proceed by notification rather than requiring prior approval.
However, low-level activities remain subject to detailed notification requirements under Regulations 18 and 20 of the Energy Resources Regulations 2013. Regulation 20 applies many of the same information requirements to both high- and low-surveillance activities, including information about the activity, location, contractors, land access, environmental requirements and, depending on the activity, detailed technical information.
Some of this information is necessarily specific to the proposed activity. Other requirements relate to matters that DEM already regulates or for which the operator has separate statutory obligations. For example, operators must provide landowner details, declare compliance with the land-access requirements of the Act and provide a copy of the notice already required to be given to the landowner.
The notification process should reflect the purpose of low-level surveillance. DEM should receive the information it needs to understand what is proposed, where and when it will occur, and any information that is new or specific to the activity. Operators should not be required to reproduce information DEM already holds or provide supporting material demonstrating compliance with separate obligations where a declaration would provide sufficient assurance.
SACOME recommends amending Regulations 18 and 20 of the Energy Resources Regulations 2013 to limit notification requirements for low-surveillance activities to information specific to the proposed activity, matters that have materially changed and evidence necessary to demonstrate compliance with statutory requirements. Operators should be able to reference current information already held by DEM, including approved management systems and environmental arrangements, rather than resubmit it.
These reforms could be implemented through amendment of the Energy Resources Regulations 2013 without amendment of the Energy Resources Act 2000.
Summary
South Australia possesses world-class mineral and energy resources.
The state's challenge is not attracting interest in those resources, but ensuring that regulatory processes are proportionate, streamlined and increase South Australia’s ability to compete for capital.
The reforms proposed by SACOME do not seek lower standards. They seek a system where regulatory effort is focused on genuine environmental, heritage and safety risks.
If implemented, these reforms would improve productivity, strengthen investment competitiveness and help South Australia realise the full economic potential of its resources sector.